Demonstration Projects

Sub-Project 6a Location: Portugal
This demonstration project is designed to acclimatize a showroom (50 m2 at the ground
floor) and office rooms (125 m2 at the top floor) at AoSol two storey...
more
Sub-Project 7 Location: Milan (Italy)
The mCHCP system is installed in a plastic film factory.It is made of a 50 kWe gas fired internal combustion cogenerator, a 17 kW water ammonia absorption chiller and two air handling...
more
(c) PolySMART 2006 |
Impress |
Privacy Policy
|
Contact
back |
|
 |
This website has been produced with the financial assistance of the European Union. The contents are the sole responsibility of PolySMART and can under no circumstances be regarded as reflecting the position of the European Union. |
 |